Zia Fertiliser resumes production

Our Correspondent, B'baria
The Asuganj Zia Fertiliser Factory resumed production yesterday after three days' suspension.

The factory had stopped operation at about 7 pm on November 21 due to technical fault in the power plant.

During the suspension, the factory suffered a production loss of about 1,300 tonnes of Urea a day, sources there said.